Fire Station #35

Project Summary

This was a ground-up project with approximately 9000 SF and 3 apparatus garage(s). The project was fairly smooth with the exception that the plans were based on a prototype drawings and when those drawings were “flipped’ for the adjustment to the next property location, some items were not considered. However, RCI was able to work closely with the A/E (PGAL) on a decent reorganization effort and mitigate impacts that could have been significant.

Fire Station 35
Fire Station 35 - 2

More projects

The projects highlighted on our website are only a selection of Rafael Construction's portfolio and do not represent all completed projects. For further details or inquiries about our work, please reach out to our Rafael Construction team.